swimming pool services

Marbelite vs Fibreglass: Which Pool Finish Is Right for You?

A marbelite pool finish is the classic South African pool surface: a matte, hand-trowelled plaster that is affordable, easy to customise and simple to renew. It works on new concrete pools and on older pools due for a fresh surface. Fibreglass is the other main option. Both are excellent, proven finishes used on thousands of Gauteng pools, but they behave differently in cost, feel, maintenance and lifespan. This page starts with what marbelite does well, then gives an honest side-by-side comparison.

What is a marbelite pool finish?

Marbelite is a cement-based plaster made from white cement and crushed marble aggregate, trowelled on by hand and cured for a smooth, bright finish. It’s the classic South African pool surface — affordable, attractive and well understood. See our pool marbelite service.

Benefits and characteristics of a marbelite pool finish

  • Affordable upfront: a new 6×4 marbelite pool costs about R78,000, against around R85,000 for fibreglass.
  • Classic matte look: the plaster finish suits natural stone and warmer, more traditional exteriors.
  • Bright and smooth when new: the matte texture also gives a secure grip underfoot.
  • Customisable: every pool is built in concrete first, so the shape is yours. Marbelite pools also take ceramic mosaic tiles.
  • Renewable: an ageing marbelite surface can be redone without rebuilding the pool.
  • Solid base: the finish sits on a 150mm shell of 30 MPa ready-mix concrete.
  • Guaranteed: remarbelite work carries a 5-year guarantee, and the concrete shell carries 10 years.

Marbelite also has traits worth knowing before you choose it:

  • It is porous, so dirt and algae take hold more easily than on a sealed surface.
  • It needs tighter water balance. Poor chemistry can leave the surface rough or discoloured.
  • It is rigid, so ground movement can cause surface cracking.
  • Colour can look slightly mottled in places, which is natural for a hand-trowelled plaster.

Good water care manages every one of these, and marbelite can be repaired or renewed if the surface wears.

How a marbelite pool is built and finished

The finish is the last coat on a long sequence. Each step below sets up the one after it, so the order matters.

  1. Mark out and square the site. Every later measurement depends on it.
  2. Excavate by hand and TLB where access and space allow.
  3. Fit the steel reinforcement: Y8 steel bars and 100mm mesh wire, along with a ring beam.
  4. Pour the concrete shell: 30 MPa ready-mix from a reputable supplier, 150mm thick.
  5. Position the weir, aim-flow and LED light while the concrete is setting.
  6. Let the concrete cure for three to five days.
  7. Lay the bull-nose copings, normally 450x450mm flagstone.
  8. Lay the paving, also 450x450mm, to create a 900mm apron around the pool.
  9. Install the ceramic mosaic tiles, with 50mm PVC piping for suction and return.
  10. Install the ‘Box’ combo unit: pump, sand filter, electrical distribution board with a battery-backed timer, and a pump house.
  11. Connect the smaller fittings — the weir, aim-flow and LED light — with the wiring run back to the board.
  12. Apply the marbelite and leave it to cure overnight.
  13. Fill the pool with water and commission it.

A new pool takes two to three weeks from start to finish. A remarbelite on an existing pool takes three to five days.

What a marbelite pool finish costs

  • New 6×4 marbelite pool: about R78,000, against around R85,000 for a fibreglass pool.
  • Remarbelite on a 6×4 pool: about R18,000, against about R25,000 for fibreglass refinishing.
  • One overall price: new builds and remarbelite jobs are quoted as a single price. Minor changes, such as a light change or a sand change, sit inside it.
  • Water features: a weir, cascade or spout adds plumbing and sometimes extra pump capacity, so price it into the build from the start.

Looking after a marbelite pool finish

  • Keep pH, alkalinity and chlorine in balance. Water chemistry is the biggest single factor in how long the surface stays bright and smooth.
  • Brush the surface regularly so dirt and algae don’t settle into the plaster.
  • Add chemicals diluted and spread through the pool, never dumped in one spot.
  • Test borehole water before you fill, because metals in it can stain plaster.

Trademen Pools offers maintenance contracts if you would rather hand this over. The guarantees are honoured whenever wear is normal. They don’t cover damage from natural causes such as weather, or from interference such as someone walking on wet marbelite.

What is fibreglass?

Fibreglass lining is built up from resin and glass matting and sealed with a UV-stable gelcoat, creating a smooth, flexible, non-porous shell. It resists algae and copes well with minor ground movement. On a fibreglass finish, the pool is plastered and left to dry completely before the resin and gelcoat go on and cure. More on our pool fibreglass service.

Marbelite pool finish vs fibreglass — side by side

  • Upfront cost: Marbelite is usually cheaper to install, at about R78,000 for a 6×4 pool against around R85,000. Fibreglass costs more but pays back in low maintenance.
  • Feel: Fibreglass is glass-smooth. Marbelite is smooth when new but can roughen as it ages, and its matte texture grips well underfoot.
  • Maintenance: Fibreglass is non-porous and resists algae, so it’s easier on chemicals. Marbelite is more porous and needs tighter water balance.
  • Durability & movement: Fibreglass flexes with minor ground movement. Marbelite is rigid and more prone to surface cracking.
  • Look: Marbelite gives that classic, matte plaster look that suits natural stone and warmer, traditional exteriors. Fibreglass offers a sleek, colour-stable finish with a slight sheen, which suits the cleaner, contemporary lines of newer apartment developments.
  • Lifespan: Both last many years when installed well and looked after. Remarbelite and fibreglass refinishing each carry a 5-year guarantee.
  • Repair approach: Marbelite can be repaired or fully renewed with a remarbelite in three to five days. Fibreglass is repaired with resin and gelcoat.

Which pool finish should you choose?

For most Gauteng pools, marbelite is the finish to choose. It has the lowest upfront cost, a classic look, a 5-year guarantee, and the option to renew the surface later without rebuilding. If you’d rather pay a little more for a glass-smooth, algae-resistant surface, fibreglass is a strong alternative. That is especially true where Gauteng’s sometimes-shifting ground is a concern, because fibreglass flexes with it. The honest answer for your pool depends on your budget and how you use it, which is why we always recommend an on-site assessment before deciding.

Can you switch from marbelite to fibreglass?

Yes — fibreglass refinishing over a prepared marbelite shell is one of the most common upgrades we do, and it’s a great way to give an older plaster pool a modern, low-maintenance surface without rebuilding. If you’d rather keep the classic look, a remarbelite renews the plaster in three to five days. If your pool needs a broader refresh, our pool renovation service covers it, and you can see where we work on our service areas page.

Frequently asked questions

Is fibreglass better than marbelite?

Not for most pools. Marbelite is the better all-round choice: a classic finish at a lower upfront cost that you can renew when it ages. Fibreglass is smoother, non-porous and lower-maintenance, and costs more. The right choice still depends on your pool, budget and how long you want the finish to last.

Can you fibreglass over an existing marbelite pool?

Yes. Fibreglass refinishing over a properly prepared marbelite shell is one of the most popular upgrades we do, giving an older plaster pool a smooth, sealed, low-maintenance surface. A remarbelite is the alternative if you want to keep the plaster look.

Which finish lasts longer?

With correct installation and balanced water, both last many years. Remarbelite and fibreglass refinishing each carry a 5-year guarantee, and the concrete shell carries 10 years. Fibreglass is non-porous and very forgiving. Marbelite is durable but more porous, so water chemistry matters more to its lifespan.

Which is easier to maintain?

Fibreglass is generally easier — its smooth, non-porous surface resists algae and is gentle on chemicals. Marbelite needs a little more attention to water balance to stay bright and smooth, and a maintenance contract can take that off your hands.

How much does a marbelite pool finish cost?

A new 6×4 marbelite pool costs about R78,000, and a remarbelite on a 6×4 pool costs about R18,000. Each job is quoted as one overall price, with minor changes such as a light change or sand change included.

How soon can the pool be filled after marbelite is applied?

The marbelite is applied and left to cure overnight. The pool is then filled with water and commissioned.

Can a marbelite pool finish be repaired instead of replaced?

Yes. Marbelite can be repaired, and when the whole surface has aged, a remarbelite renews it without rebuilding the pool.

Is a marbelite pool finish better than paint?

Marbelite is a cement-based plaster, so it forms a thicker, harder-wearing surface than a coat of paint. It costs more upfront than paint, but it is the longer-term finish and a proper, guaranteed one.

Not sure which finish suits your pool?

We’ll give you honest, no-pressure advice for your specific pool and budget. Call: 081 537 0757  |  Email: sales@trademen.co.za. Trademen Pools serves the whole of Gauteng with free quotes.

For more background, see this external overview of the properties of fibreglass.

Ready to price your marbelite pool?

Send Trademen Pools your pool size and site details, and you get one overall price for the build, finish included. The team can start straight away, and a new pool takes two to three weeks.

Leave a Comment

Your email address will not be published. Required fields are marked *